Hidden slab leak, Al Shati villa
1
day
Scope
Thermal + acoustic detection, single-tile access, repipe of one hot line.
Outcome
Leak stopped, floor restored, water bill back to normal within a cycle.

profilo-studio
Made by ariya-tech.net
Our Work
A sample of recent work across Jeddah — the problem, what we did, and how long it took. Prices are indicative and in SAR.
1
day
Scope
Thermal + acoustic detection, single-tile access, repipe of one hot line.
Outcome
Leak stopped, floor restored, water bill back to normal within a cycle.
22
floors
Scope
Coil cleaning across 22 floors, refrigerant top-up, thermostat recalibration.
Outcome
Cooling restored to spec, energy draw down noticeably in summer peak.
6
outlets
Scope
Main-line sediment + carbon stages, under-sink RO, tank clean and seal.
Outcome
Clear, odour-free water at every tap; cartridge reminders now automated.
52
min response
Scope
Isolated the floor, replaced a corroded section, pressure-tested the stack.
Outcome
Water back on for the building by sunrise, one apartment affected only.
Every job leaves with photos, a written warranty, and your old parts if you want them.
24/7 emergency line
Leak, blockage or an AC down in the heat — one call and a stocked van is on the way.