Structure & build
Foundations, reinforced concrete, and steel frame poured by our own crews. Formwork we own, tolerances we measure.

profilo-studio
Made by ariya-tech.net
Riyadh · Since 2004
General contracting with an engineer’s discipline — we self-perform the structure, run the fit-out, and hand over on the date we signed, not the date it got easy.
Three disciplines, one accountable crew. No hand-offs to blame when a date slips — because it doesn’t slip.
Foundations, reinforced concrete, and steel frame poured by our own crews. Formwork we own, tolerances we measure.
From shell to handover-ready — partitions, joinery, finishes, and a snag list we close before you see it.
Earthworks, roads, drainage, and utility networks — the unglamorous work that decides whether everything above it lasts.
A few we point to when someone asks whether we can hold a date.
19-storey commercial tower, structure and full fit-out. Handed over two weeks early.
Structure · Fit-out
32,000 m²
02Four warehouse blocks, hardstand yard, and the entire site infrastructure package.
Industrial · Civil
54,000 m²
03A live-operating clinic refitted floor by floor, with zero closed days.
Healthcare · Fit-out
6,400 m²
Four phases, one programme, and a weekly report that tells you the truth about the date.
Site setup, survey, and a programme baseline everyone signs before a shovel moves.
Foundations up. Concrete and steel self-performed, inspected, and cast against the drawings.
MEP first-fix, finishes, and joinery — trades sequenced so nobody undoes another’s work.
Commissioning, snag closed, and an O&M file handed over with the keys — not a month after.
Safety & HSE
A programme is only as good as the site that builds it. Ours runs to ISO 45001, with daily toolbox talks, a dedicated HSE officer on every project, and a lost-time record we publish because we’re proud of it.
Rafid handed over the tower two weeks early and closed the snag list before we did.
Send us the drawings — even rough ones. You’ll get a method and a date, not a runaround.