Pipe rack modules
Twenty pre-assembled rack modules shipped by low-bed and bolted up in the plant on a ten-day window, cutting field welding to near zero.
- Tonnage
- 2,400 t
- Material
- S355 JR
- Finish
- 3-coat epoxy

profilo-studio
Made by ariya-tech.net
03 Projects
A slice of the yard’s log — heavy fabrication across the Eastern Province, each job by tonnage, material, and year.
Twenty pre-assembled rack modules shipped by low-bed and bolted up in the plant on a ten-day window, cutting field welding to near zero.
Shell courses and roof plates for three product tanks, rolled and edge-prepped in the shop, welded out and tested on the tank farm.
Deck steel, fender frames, and mooring dolphins fabricated to a marine coating spec, hot-dip galvanized and sealed for splash-zone service.
Forty clear-span portal frames for a distribution warehouse, built as bolted kits so a single crew could stand a bay a day.
Traveling-screen frames and trash racks in duplex stainless for a seawater intake, built to survive the Gulf and clean out on a schedule.
Heavy support steel and platforms for two utility boilers, fabricated to tight camber tolerances and galvanized for a thirty-year life.
Most of what we fabricate ships under client confidentiality. Ask and we’ll walk you through a case with the drawings in the room.
Request a quote
Tell us the sector, the steel, and the date. We come back with a fixed quote and a delivery you can plan around.